Cal/OSHA has implemented standards for employees working outdoors or indoors in elevated temperatures, which include mandatory training, and provision of breaks or cooling areas depending on the situation. Note that standards differ for indoor vs outdoor. View general information about heat illness prevention and response.
Indoor Work
Indoor work with high heat
Heat illness can occur in indoor areas where temperatures reach or exceed 82°F. Heat may be due to mechanical ventilation issues, radiant heat from equipment, or when outdoor temperatures are high. Examples of impacted areas include mechanical rooms, laundry rooms, dishrooms, cooklines, greenhouses, steam tunnels and other spaces - on very hot days many campus buildings, offices and classrooms may also become hot.
Indoor Heat Illness Prevention Plans
Each building must create an Indoor Heat Illness Prevention Plan using the Worksite Specific Work Planning and Site ChecklistContact the building manager for a copy of the plan. This plan addresses elevated indoor temperature impacts during heatwaves and mechanical ventilation failures. Departments may create their own plans for their spaces if desired, but should consult the building manager.
When work is necessary in isolated rooms experiencing elevated temperatures, e.g. in mechanical rooms, boiler rooms, warm rooms (for research) etc., individual heat illness prevention plans should be prepared for those spaces. Use the Worksite Specific Work Planning and Site Checklist (“Required for Indoor Work”). Workers must take Heat Illness Prevention Trainingprior to commencing work.
Supervisors and Managers can protect employees from indoor heat illness by:
-
Developing and implementing an Indoor Heat Illness Prevention Plan for their work areas that are expected to exceed 82°F. This is accomplished by completing the Worksite Specific Work Planning and Site Checklist. A copy of the plan must be available at or near the worksite.
-
Ensuring completion of heat illness prevention training via one of the following options:
-
Employees must complete EHS 702 Heat Illness, a 20-minute online course available through the UC Learning Center.
- Or Employees must attend a supervisor-led discussion using the EH&S Heat Illness Fact Sheet and Worksite Specific Work Planning and Site Checklist (This option includes a form to document training attendance). This training includes a review of the items in the Prevention Plan, as well as information about the signs and symptoms of heat illness, access to water and cool down areas, responding to emergencies, and monitoring employees.
-
- Providing access to reasonably cool, clean, drinking water, enough to provide each employee with up to 4 cups per hour.
- Providing rest periods and access to cool-down areas that are maintained below 82°F
- Monitoring employees for signs of heat exhaustion and heat stroke, and initiating first aid measures or emergency response.
- Monitoring the weather, temperature and heat index. Supervisors can find weather information at Weatherunderground.com, or National Weather Service. A smartphone application such as the Heat Index app is also available.
- Identifying indoor work locations with high radiant heat, or locations subject to high temperatures based on weather conditions. Implement the heat illness prevention controls in these locations.
Campus Buildings with A/C
Many UC Berkeley buildings do not have air conditioning and can be as hot as outside temperatures. If you need to seek refuge from heat, the following buildings are air conditioned and have seating in lobbies during normal operating hours.
|
Building |
Area with Cooling |
|
2195 Hearst Ave / Warren Hall |
Whole Building |
|
Anna Head (building E/F) |
Whole Building |
|
|
|
|
Barker Hall |
Whole Building |
|
Berkeley Art Museum (BAM/PFA) |
Whole Building |
|
Birge Hall |
Whole Building |
|
Blum Hall |
Whole Building |
|
Calvin Lab |
Whole Building |
|
Chavez Center |
Whole Building |
|
Chou Hall |
Whole Building |
|
Doe Annex / Bancroft Library |
Whole Building |
|
Doe Stacks / Gardner Stacks |
Whole Building |
|
Durant Hall |
Whole Building |
|
Dwinelle Hall |
Basement Level |
|
Energy Biosciences Building (IGIB) |
Whole Building |
|
Eshleman Hall |
Whole Building |
|
Golden Bear Cafe |
Whole Building |
|
Haas Business- Admin Building |
Whole Building |
|
Haas Business -Bakar Hall |
Auditorium, Cafe, Forum, Koret Center |
|
Haas School of Business - Cheit Hall |
Whole Building |
|
Haas School of Business - Chou Hall |
Whole Building |
|
Hildebrand Hall |
Whole Building |
|
Innovative Genomics Institute Building (IGIB) |
Whole Building (access limited) |
|
Koshland Hall |
Whole Building |
|
Kroeber -Hearst Museum |
Whole Gallery Area |
|
Latimer Hall |
Whole Building |
|
Li Ka Shing Center |
Whole Building |
|
Life Sciences Addition (LSA) |
Whole Building |
|
Minor Hall |
Floors 5, 6 only |
|
Minor Hall Addition |
Whole Building |
|
Moffitt Library |
Whole Building |
|
Physics South |
Floors 1 - 4 |
|
Regatta Museum Collection |
Whole Building |
|
Silver Lab Addition |
Whole Building |
|
Social Sciences Building |
8th Floor |
|
Soda hall |
Whole Building |
|
Stanley Hall |
Whole Building |
|
Tan Hall |
Whole Building |
|
Valley Life Science Building |
Whole Building |
|
Weill Hall |
Whole Building |
If employees work alone or for extended periods in impacted areas, please contact EH&S via ehs@berkeley.edu to schedule an evaluation. EH&S staff will assist in development of a site-specific safety plan to prevent heat illness.
Resources
Work Planning and Site Checklist
(used for indoor work in specific locations where the temperatures exceed 82F)
Building-Specific Master Template Plan for Heat Illness Prevention
(used by building managers to create a building-wide plan for heatwaves and HVAC interruptions)
General Campus Indoor Heat Illness Prevention Plan
(a campus-wide plan for indoor heat illness prevention in the absence of a building-specific plan