Indoor Heat Illness Prevention

Cal/OSHA has implemented standards for employees working outdoors or indoors in elevated temperatures, which include mandatory training, and provision of breaks or cooling areas depending on the situation. Note that standards differ for indoor vs outdoor. View general information about heat illness prevention and response. 

Indoor Work

Indoor work with high heat

Heat illness can occur in indoor areas where temperatures reach or exceed 82°F. Heat may be due to mechanical ventilation issues, radiant heat from equipment, or when outdoor temperatures are high. Examples of impacted areas include mechanical rooms, laundry rooms, dishrooms, cooklines, greenhouses, steam tunnels and other spaces - on very hot days many campus buildings, offices and classrooms may also become hot.

Indoor Heat Illness Prevention Plans

Each building must create an Indoor Heat Illness Prevention Plan using the Worksite Specific Work Planning and Site ChecklistContact the building manager for a copy of the plan. This plan addresses elevated indoor temperature impacts during heatwaves and mechanical ventilation failures. Departments may create their own plans for their spaces if desired, but should consult the building manager.

When work is necessary in isolated rooms experiencing elevated temperatures, e.g. in mechanical rooms, boiler rooms, warm rooms (for research) etc., individual heat illness prevention plans should be prepared for those spaces. Use the Worksite Specific Work Planning and Site Checklist (“Required for Indoor Work”). Workers must take Heat Illness Prevention Trainingprior to commencing work.

Supervisors and Managers can protect employees from indoor heat illness by:

  1. Developing and implementing an Indoor Heat Illness Prevention Plan for their work areas that are expected to exceed 82°F. This is accomplished by completing the Worksite Specific Work Planning and Site Checklist. A copy of the plan must be available at or near the worksite.

  2. Ensuring completion of heat illness prevention training via one of the following options:

    1. Employees must complete EHS 702 Heat Illness, a 20-minute online course available through the UC Learning Center.

    2. Or Employees must attend a supervisor-led discussion using the EH&S Heat Illness Fact Sheet and Worksite Specific Work Planning and Site Checklist (This option includes a form to document training attendance). This training includes a review of the items in the Prevention Plan, as well as information about the signs and symptoms of heat illness, access to water and cool down areas, responding to emergencies, and monitoring employees.
  1. Providing access to reasonably cool, clean, drinking water, enough to provide each employee with up to 4 cups per hour.
  1. Providing rest periods and access to cool-down areas that are maintained below 82°F
  1. Monitoring employees for signs of heat exhaustion and heat stroke, and initiating first aid measures or emergency response.
  1. Monitoring the weather, temperature and heat index. Supervisors can find weather information at Weatherunderground.com, or National Weather Service. A smartphone application such as the Heat Index app is also available.
  1. Identifying indoor work locations with high radiant heat, or locations subject to high temperatures based on weather conditions. Implement the heat illness prevention controls in these locations.

Campus Buildings with A/C

Many UC Berkeley buildings do not have air conditioning and can be as hot as outside temperatures. If you need to seek refuge from heat, the following buildings are air conditioned and have seating in lobbies during normal operating hours.

Building

Area with Cooling

2195 Hearst Ave / Warren Hall

Whole Building

Anna Head (building E/F)

Whole Building


Anthropology & Art Practice


Hearst Museum of Anthropology Gallery (access limited)

Barker Hall

Whole Building

Berkeley Art Museum (BAM/PFA)

Whole Building

Birge Hall

Whole Building

Blum Hall

Whole Building

Calvin Lab

Whole Building

Chavez Center

Whole Building

Chou Hall

Whole Building

Doe Annex / Bancroft Library

Whole Building

Doe Stacks / Gardner Stacks

Whole Building

Durant Hall

Whole Building

Dwinelle Hall

Basement Level

Energy Biosciences Building (IGIB)

Whole Building

Eshleman Hall

Whole Building

Golden Bear Cafe

Whole Building

Haas Business- Admin Building

Whole Building

Haas Business -Bakar Hall

Auditorium, Cafe, Forum, Koret Center

Haas School of Business - Cheit Hall

Whole Building

Haas School of Business - Chou Hall

Whole Building

Hildebrand Hall

Whole Building

Innovative Genomics Institute Building (IGIB)

Whole Building (access limited)

Koshland Hall

Whole Building

Kroeber -Hearst Museum

Whole Gallery Area

Latimer Hall

Whole Building

Li Ka Shing Center

Whole Building

Life Sciences Addition (LSA)

Whole Building

Minor Hall

Floors 5, 6 only

Minor Hall Addition

Whole Building

Moffitt Library

Whole Building

Physics South

Floors 1 - 4

Regatta Museum Collection

Whole Building

Silver Lab Addition

Whole Building

Social Sciences Building

8th Floor

Soda hall

Whole Building

Stanley Hall

Whole Building

Tan Hall

Whole Building

Valley Life Science Building

Whole Building

Weill Hall

Whole Building

If employees work alone or for extended periods in impacted areas, please contact EH&S via ehs@berkeley.edu to schedule an evaluation. EH&S staff will assist in development of a site-specific safety plan to prevent heat illness.

Resources

Work Planning and Site Checklist
(used for indoor work in specific locations where the temperatures exceed 82F)

Building-Specific Master Template Plan for Heat Illness Prevention
(used by building managers to create a building-wide plan for heatwaves and HVAC interruptions)

General Campus Indoor Heat Illness Prevention Plan
(a campus-wide plan for indoor heat illness prevention in the absence of a building-specific plan

Indoor Heat Illness Prevention and Response Factsheet

Heat Illness Prevention in Indoor Workplaces Information for Employers  Fact Sheet (Cal/OSHA)(PDF file)

CalOSHA Heat Illness Prevention Guidance and Resources