Move Manual: Attachment to Laboratory and Shop Move Manual

Facilities/Equipment Decontamination Clearance

(Sample Only - to print out a paper copy, download PDF found on Table of Contents page)
EH&S has assessed this location or equipment and determined that it can be released for reuse with no restrictions. This does not provide clearance for facilities or equipment containing lead paint or asbestos components.

Building
Room Number
Facility Description
Equipment
 
Check and sign where applicable:

Biohazardous Materials. When in use, biohazardous materials were handled in accordance with UC Berkeley policy and this area has been disinfected.
   checkbox Cleared By: _____________________ or checkbox N/A: ________________________

Radiological Materials. UC Berkeley’s EH&S Radiation Safety Team has cleared this area for unrestricted use. No regulated radioactive materials remain.
   checkbox Cleared By: _____________________ or checkbox N/A: ________________________

Laboratory Chemicals. Laboratory chemicals have been removed and disposed of in accordance with the UC Berkeley EH&S requirements. No regulated chemicals remain.
   checkbox Cleared By: _____________________ or checkbox N/A: ________________________

Controlled Substances. Laboratory chemicals have been removed and disposed of in accordance with the UC Berkeley EH&S requirements. No regulated chemicals remain.
   checkbox Cleared By: _____________________ or checkbox N/A: ________________________

 
EH&S Contact (please print):

Name:______________________________________________________ Date:_______________________

Phone Number: _______________________



uc seal Contact Us | Employment | Feedback | Berkeley Home | ©2009 University of California, Berkeley